Cotulla WWTP Permit Renewal
City of Cotulla - Cotulla, Texas
Acted as City's representative in submitting all required documentation and performing all required
analyses to renew the City's Waste Water Treatment Plant discharge permit. The plant size was .95
MGD. The permit was successfully secured.
Cuero WWTP Permit Renewal
City of Cuero - Cuero, Texas
Acted as City's representative in submitting all required documentation and performing all required
analyses to renew the City's Waste Water Treatment Plant discharge permit. The plant size was .99
MGD. The permit was successfully secured.
Preliminary Design and Fuel Tank Permitting Analysis
University of Texas at San Antonio - San Antonio, Texas
YPR worked with the local and state regulatory agencies to secure a fuel storage permitting plan for
the University. Developed a preliminary plan for a campus fueling station.
Construction Cost: $ 100,000
Shavano Park Drainage (FEMA)
City of Shavano Park - Shavano Park, Texas
Reviewed and analyzed the proposed FEMA Flood Plains. Made recommendations on changes and
assisted the City in filing necessary appeals and protests.
Shavano Park Stormwater Management Plan
City of Shavano Park - Shavano Park, Texas
Developed a Stormwater Management Plan for the City of Shavano Park as required by TCEQ. Plan
included action plans, monitoring activities, public awareness, water quality goals and management
plans. Plan was approved by state.
TCEQ Permitting for Bulverde Road
San Antonio Water System - San Antonio, Texas
Acted as SAWS representative working with TCEQ to resolve sewer construction permitting issues.
Aquifer Storage and Recovery Project
San Antonio Water System - San Antonio, Texas
Managed the Design and Construct project involving the production, storage and treatment of
groundwater. Project components include 60 miles of large diameter pipeline, a water treatment facility,
production facilities, and ejection well fields.
Construction Cost: $ 225,000,000
CIP Plan Implementation
San Antonio Water System - San Antonio, Texas
Planning and design and construction annually of $200 million dollar of thermal facilities, water,
wastewater, drainage, treatment plants, lift stations, roadways, parking lots, pipelines for a large water
and wastewater company. Included land acquisitions, surveying, platting, and permitting.
Construction Cost: $ 200,000,000 annually
Recycled Water Program
San Antonio Water System - San Antonio, Texas
Managed the design and construction project which provides 30,000 acre/feet of recycled water
annually. Components include 50 miles of large diameter pipelines and production facilities.
Construction Cost: $ 125,000,000
Thermal Energy Facility
San Antonio Water System - San Antonio, Texas
Design and Construct a 15,000 Ton Cooling Facility, distribution system and administrative building to
serve commercial customers. Developed concept, developed feasibility, designed and managed
construction.
Construction Cost: $ 20,000,000


Projects
YOUNG PROFESSIONAL RESOURCES 8209 Roughrider Drive, Suite 101 Windcrest, Texas 78239
|
Young Professional Resources | Firm Number F-8635 8209 Roughrider Drive, Suite 101 | Windcrest, Texas 78239 Phone: 210-590-9215 Fax: 210-590-9346
|


Bulverde Road Street Widening (Sewer and Water Replacement)
City of San Antonio / San Antonio Water System - San Antonio, Texas
The project widens the roadway, improves drainage and add bike lanes. YPR was responsible for the
collection of utility plans for the project and to resolve utility conflicts with utility agencies. YPR
designed of all water and sewer replacements within the project limits. Design consisted of 17,500 LF
of 36” diameter water mains and 4,200 LF of 12” water mains and 5,800 LF of sewer.
Cost: $ 7,000,000 (Utility only) The total cost $30,000,000 Project Pictures
BexarMet Swann Water Distribution System
Bexar Metropolitan Water District - San Antonio, Texas
YPR designed a 16" and a 24” water distribution system consisting of approximately of 5800 LF of
construction.
Cost: $ 1,500,000
San Antonio Housing Authority Water and Sewer Replacements
San Antonio Housing Authority - San Antonio, Texas
YPR designed the replacements of 4500 LF of 8” sewer lines; 5700 of 6” water lines and 60 water
isolation valves. The original estimated budget by client was $2,000,000. Engineer was able to design
the full project scope and to have constructed for $1,400,000 without an increase in cost during
construction.
Cost: $ 1,400,000 Project Pictures
2008 Utility System Improvements
City of Cuero - Cuero, Texas
As the City Engineer, YPR successfully completed the design or construction administration services
for 2 wastewater lift stations; a water valve replacement project; replacement of approximately 1000 LF
of 8 inch water main; replacement of approximately 100 water meters; street improvements; fire
hydrant replacements and repair and the rehabilitation of 24” aerial sewer crossing.
Cost: Total estimated cost is $900,000 Project Pictures
N.W. 28th Street Water/Sewer Project
San Antonio Water System - San Antonio, Texas
The City of San Antonio is performing major street maintenance projects and the San Antonio Water
System has identified existing water and sewer mains which are in need of replacement and must be
replaced prior to the City’s street maintenance program being started. Replacing 2600 LF of 6 and 8
inch water lines and 1700 LF of 8 and 12 inch sewer lines.
Cost: $ 650,000 Project Pictures
City of Cotulla Wastewater Plant Improvements
City of Cotulla - Cotulla, Texas
Provide design and construction administration services for a 1 MGD wastewater treatment plant
including pump replacements, lift station rehabilitation, aerator replacement, chlorination system
replacement, clarifier rehabilitation and electrical improvements.
Cost: $ 450,000 Project Pictures
Senisa Street Project
San Antonio Water System - San Antonio, Texas
The City of San Antonio is performing major street maintenance projects and the San Antonio Water
System has identified existing water and sewer mains which are in need of replacement and must be
replaced prior to the City’s street maintenance program being started. YPR designed the replacement
of 1650 LF of 6" water lines and 500 LF of 8" sewer lines.
Cost: $ 310,000 Project Pictures
Wheatley Heights Sports Complex
Pape-Dawson Engineers, Inc. - San Antonio, Texas
Design water and sewer infrastructure to service this property development. YPR designed the
replacement of approximately 2600 LF of 12" water lines and 900 LF of 18" sewer line.
Cost: $ 300,000 Project Pictures
Neptune Street Project
San Antonio Water System - San Antonio, Texas
The City of San Antonio is performing major street maintenance projects and the San Antonio Water
System has identified existing water mains which are in need of replacement and must be replaced
prior to the City’s street maintenance program being started. YPR designed the replacement of 2100
LF of 6" water lines.
Cost: $ 275,000 Project Pictures
Balcones Heights Drainage Improvements
Bexar County and City of San Antonio - San Antonio, Texas
The project is to convert a flood prone area into a retention/detention pond to reduce flooding in the
area. YPR worked with utility companies to resolve conflicts and providing recommendations on
preliminary realignments of utilities.
Cost: $ 250,000
Baywood and Baltic Street Project
San Antonio Water System - San Antonio, Texas
The City of San Antonio is performing a major street re-construction project and the San Antonio
Water System has identified existing water and sewer mains which are in need of replacement and
must be replaced prior to the City’s street project being started. YPR designed the replacement of 900
LF of 6" water lines and 1000 LF of 8" sewer lines.
Cost: $ 200,000 Project Pictures
Hudson Street Project
San Antonio Water System - San Antonio, Texas
The City of San Antonio is performing major street maintenance projects and the San Antonio Water
System has identified existing water and sewer mains which are in need of replacement and must be
replaced prior to the City’s street maintenance program being started. YPR designed the replacement
of 1100 LF of 6" water lines and 270 LF of 8" sewer lines.
Cost: $ 200,000 Project Pictures
Borgfeld Road Project
San Antonio Water System - San Antonio, Texas
YPR designed water and sewer pipeline system adjustments to accommodate drainage construction.
Approximately 300 LF of water/sewer piping.
Cost: $ 80,000
Olmos Park Water Project
San Antonio Water System - San Antonio, Texas
YPR designed water and sewer pipeline system adjustments to accommodate drainage construction.
Approximately 150 LF of water and sewer piping.
Cost: $ 30,000 Project Pictures












CoSA 2008 Alley Improvements
City of San Antonio - San Antonio, Texas
Design and construction administration to improve 33 alleys used for public access and garbage
collection. Re-Asphalting or total reconstructions of the alleys are necessitated. YPR designed the
pavement sections and provided construction management services.
Cost: (Estimated cost - $ 900,000 ) (Actual Cost – $800,000) Project Pictures
Cuero Housing Authority - Street and Utility Improvements
Housing Authority of the City of Cuero - Cuero, Texas
The project involved the design of street improvements and sewer/water replacements for 2 streets.
Size: 1800 centerline feet of street. Replacement of 900 LF of water and 800 LF of sewer.
Cost: $ 300,000 Project Pictures

Las Palmas Subdivision - Plat and Construction Plan Review
City of Cotulla - Cotulla, Texas
Reviewed the construction and plat plans for a 50 acre commercial development. Infrastructure
included sidewalks, curbs, drainage, streets, water and sewer.
Construction Cost: $ 5,000,000
BexarMet Northwest Distribution Master Plan and Analysis
Bexar Metropolitan Water District (Sub Consultant to Pape Dawson Engineers) - San Antonio, Texas
Develop land use assumptions and population projections for the water utility. Reviewed the Water
Capital Improvements Plans for the project area.
City of Cuero 5 Year Sewer CIP
City of Cuero - Cuero, Texas
Developed a 5 year master plan to improve the sewer collection system and treatment facilities for the
entire City of Cuero. Delivered a report containing maps, costs and the prioritization of improvements
projects.
City of Cuero 5 year Street CIP
City of Cuero - Cuero, Texas
Developed a 5 year master plan to improve the street system and associated drainage for the entire
City of Cuero. Delivered a report containing maps, costs and prioritization of improvements projects.
City of Cuero 5 Year Water CIP
City of Cuero - Cuero, Texas
Developed a 5 year master plan to improve the water system and water production facilities for the
entire City of Cuero. Delivered a report containing maps, costs and prioritization of improvements
projects.
Helotes Traffic Study
Helotes Economic Development Corporation - Helotes, Texas
Performed traffic analysis to determine the traffic lane configuration for on loading and of loading traffic
to State Highway 16 in Helotes, Texas. Provided traffic models, preliminary layouts and cost estimates.


Medina River Sewer Outfall Segment 1
San Antonio Water System - San Antonio, Texas
Prime Consultant: Pape-Dawson Engineers, Inc. - San Antonio, Texas
Providing full time construction services on this project. The project consists of the construction of
approximately 32 miles of gravity sanitary sewer main. The project will be contracted in six (6)
segments. Gravity main sizes will range from 18-inches in diameter to 96-inches in diameter. However,
the majority of the gravity main will have a diameter of 66-inches. Along the alignment of the project,
there will be portions of the project where the outfall will be installed within steel casing or liner plate so
that the pipeline can be advanced below roads and railroads without disrupting transportation routes.
In addition, several siphon structures will be constructed along the alignment.
Cost: $ 20,000,000
Brooks Development Authority Sewer and Water Improvements
Brooks Development Authority - San Antonio Texas
Prime Consultant: Pape-Dawson Engineers, Inc. - San Antonio, Texas
YPR was the sub-consultant responsible for construction observation services. The original
construction bid was for $1,000,000. As the project’s construction observer the project was managed
to complete the project without cost overruns. Replaced 3600 LF of 24” sewer lines
Cost: $ 4,000,000 Project Pictures

Old Town Helotes Improvements Project
City of Helotes Economic Development Corporation - Helotes, Texas
Young Professional Resources was the project manager and assisted in the selection of the Engineer
and the Contractor for the project. Managed budget and schedule for the project. The original
engineer’s estimate was $3,000,000 but through sound project management the work was completed
without an increase in the awarded price of $2,500,000. Constructed 8000 LF of sidewalk and curb;
constructed 3800 Lane Feet of pavement; construct 150 parking spaces and add new shrubbery and
planting.
Cost: $ 2,500,000 Project Pictures
Trinity Water Well Project
City of Shavano Park - Shavano Park, Texas
The City of Shavano Park is developing a new production well from the Trinity Aquifer. The project
included a production facility, a blending facility and transmission lines. The City has engaged the
services of an engineering firm to design the project and hired YPR to act as program manager during
both the evaluation, analysis, design and construction phases as well as to be the chief advisor to the
City Manager and City Council. The total cost of the project was $3,000,000.
Cost: $ 2,200,000 Project Pictures
Old Town Helotes Water Project
Helotes Economic Development Corporation - Helotes, Texas
Firm served as the program manager responsible for selection of a design engineer and the
construction administration for a project. The project installed approximately 4300 LF of 10 inch water
pipe. Client's budget was $1,100,000. Engineering and construction was completed for $100,000 less
than budgeted amount.
Cost: $ 1,000,000 Project Pictures






Highland Hills Cottage Project
San Antonio Development Agency - San Antonio, Texas
Reviewed the business plan and Performa for a dormant 25 home development site and made
recommendations on how to resolve development issues concerning the project. YPR evaluated the
project plans to determine its profitability while at the same seeking opportunities for alternative
funding.
Construction Cost: $ 1,300,000
City of Bonham Rate Study
City of Bonham - Bonham, Texas
Performed a cost of services rate study for water and sewer utility to determine adequacy to and made
recommendations on changes in rates.
Cuero Impact Fee Study
City of Cuero - Cuero, Texas
Developed land use assumptions, populations and growth projections and developed water and sewer
master plan to support water and sewer impact fees in accordance with the requirements of State law.
Cuero Rate Study
City of Cuero - Cuero, Texas
Performed a cost of services rate study for water and sewer utility to determine adequacy and made
recommendations on changes in rates.
Leon Valley Impact Fee Study and Infrastructure Analysis
City of Leon Valley - Leon Valley, Texas
Analyzed and made recommendations on the current utility infrastructure master plans. Reviewed the
current utility impact fees, developed a Land use Assumption Plan and a Capital Improvement Plan.
Made recommendations on changes to current impacts and developed a new impact fee for water
supply.
Mr. Young's Major Project Work as Executive for SAWS
|
Planning Engineering Management
|